Renovation project of the Meaux dam with construction of a mobile dam composed of 4 passes of 13.50 meter-wide for a total width of 54 meters. Mobile dam with a metal walkway on top to join both river banks.
A free-hanging vibrodriver 50HD was used for the preparation of renovation works and construction of a fish pass in the Cornillon canal. Our vibrodriver drove PU28 (15.9m) sheetpiles for a cofferdam, operated by our customer DFC BATTAGE before works by Léon Grosse teams.