Piling rigs
- Quick set-up from the transport to the working position
- No time spent on installing guides. The leader mast serves as a guidance for the piles and guarantees verticality.
- Faster pile driving and extraction, thanks to the additional force of the mast pull-down (20t) and pull-up force (24t).
- Accurate pile positionning and high productivity thanks to the rotating mast.
- The carrier's high engine power (403- 470 kW) supplies optimal power to the different piling tools, even under difficult soil conditions.